Modernization of 6 passenger lifts and 2 service lifts in a 38-floor office tower in the Thamrin area.

Scope of Work

About the Project

Thamrin Office Tower is a 38-floor office building with 95% occupancy. After 18 years of operation, management required comprehensive modernization to ensure lift system reliability given high daily traffic (12,000+ trips/day).

Scope of Work

  • Modernization of 6 passenger lifts (control, drive, door, cabin)
  • Modernization of 2 service lifts
  • Implementation of destination control system for peak hour efficiency
  • Access control integration with smart card per tenant floor
  • Emergency rescue system upgrade

Challenges

The building remained fully operational throughout the project. Our team applied a strict sequential schedule — only 1 unit modernized at a time, with major work performed at night and weekends to minimize tenant disruption.

Results

  • Total project duration 8 months for 8 units
  • Peak-hour waiting time reduced from 95 to 38 seconds
  • Power consumption dropped 38%
  • Tenant satisfaction score (lift) rose from 6.2 to 9.1